SHOP THE SALE NOW –VIEW ALL DEALS 🔥

 Australian Customer Support

How to install removable bollards

A removable bollard sits in a sleeve set in the ground, so you can lift it out when you need access. Getting the sleeve height and drainage right is the key. Here is how we recommend installing them.

Stainless steel removable bollard with its in-ground sleeve

Watch how to install a removable bollard

A 71-second walk-through: hole depth and drainage, testing the lock, setting the sleeve 5 mm above the ground, concrete, and checking it is flush.

No sound needed. Every step is on screen.

At a glance
Set inAn in-ground sleeve, in concrete
Hole depth70 to 100 mm deeper than the sleeve
Sleeve heightAbout 5 mm above the ground
Concrete curing timeAt least 2 to 3 days
You will need
  • The removable bollards and sleeves
  • Concrete mix
  • Gravel, blue metal or drain rock
  • Tape for the bottom of the sleeve
  • A core drill (for concrete) or a saw to cut bitumen
  • A spirit level

Hole sizes and footings

What to do depends on the surface you are installing into.

Bitumen

Cut a square in the bitumen the width of the bollard plus at least 100 mm, then dig out to at least 70 to 100 mm deeper than the height of the sleeve.

Concrete

Core drill a hole at least 100 mm wider than the in-ground sleeve, then dig out to at least 70 to 100 mm deeper than the height of the sleeve.

Check before you dig or drill. Look for water pipes, gas lines and underground wiring, and keep the work area safe from traffic.

Step by step

  1. Locate

    Mark where each bollard is going.

  2. Check for hazards

    Check for water pipes, gas lines and underground wiring before you dig. Check the traffic too, so you, pedestrians and vehicles stay safe while you work.

  3. Make the hole

    Cut or core drill the hole to suit your surface. See the hole sizes table. The extra depth is for drainage.

  4. Add drainage

    Put gravel, blue metal or drain rock in the bottom of the hole so water can drain away.

  5. Test the bollard

    Check the locking mechanism works before you set the sleeve in concrete.

  6. Place the sleeve

    Tape over the bottom of the sleeve to stop loose material getting in. The tape breaks down over time so water can drain. Stand the sleeve in the centre of the hole, with its top edge about 5 mm above the finished ground.

  7. Concrete

    Mix the concrete as the bag instructions say, then pour it evenly around the sleeve. Build it up slightly towards the top edge of the sleeve so water runs away. Take care not to move the sleeve.

  8. Check it

    Check the sleeve is level and the bollard or top cover plate fits and sits flush with the top of the sleeve.

  9. Let it cure

    Allow at least 2 to 3 days for the concrete to cure. Damp weather and cool temperatures can slow this down a lot.

Check the size of your bollard

Every bollard has a data sheet with its size, wall thickness and fixing details, with drawings.

Find your data sheet

Common questions

Why does a removable bollard need drainage?

So rain water can drain away from the sleeve instead of sitting in it. Dig 70 to 100 mm deeper than the sleeve and add gravel, blue metal or drain rock to the bottom of the hole.

How high should the sleeve sit?

About 5 mm above the finished ground, with the concrete built up slightly towards the edge so water runs off.

Should I test the lock before concreting?

Yes. Check the bollard locks and lifts out properly before you set the sleeve. It is much harder to fix once the concrete has set.

More guides

Rather we installed them for you?

We supply and install bollards across Perth and Brisbane. Call us for a quote, or for help choosing the right bollards and fixings for your site.

Stores in Perth and Brisbane, delivery Australia-wide.

These recommendations are a guide only and do not allow for site-specific requirements. If you are unsure, talk to your builder or engineer, or call us. Our bollard installation service

Bollard Shop Flat Logo

Request a Quote

Request a quote for this product, including delivery and availability.